Is there zoning in Mt. Orab?
Yes, every parcel of land inside the Village of Mt. Orab is zoned.
What are the different types of property zoning in Mt. Orab?
Property can be zoned residential, business, or industrial.
When do I need to have a zoning permit?
When building a new structure (ex. house, garage), adding to an existing structure, enclosing an area with a fence, building a deck, installing a pool, widening a driveway, adding a storage shed or building, or installing a sign.
Do I also need a building permit?
A building permit is required when constructing a new residence or commercial building. A zoning permit needs to be granted, then apply for a building permit.
Do you need a zoning permit when remodeling an existing building?
If the size or shape of the building or original structure is not changing, you do not need a zoning permit.
Can the zoning of a property be changed?
To change the zoning of a property, the property owner must file a request for the change, pay the application fee, followed by a hearing by the Zoning Board. The Zoning Board has the authority to approve or deny any requested changes. Based on recommendation by the Zoning Board, Village Council would have final approval for any change.
How can I obtain a zoning permit application?
Both residential and commercial applications are available on zoning page or at the Village offices at 211 South High Street.
Is a zoning permit required for a driveway tile?
Yes, and it cannot be smaller than 12" in diameter. If it is plastic it must be double wall with the inside smooth and has to be inspected by the zoning department.
Is a permit needed to fill in a ditch with pipe between the ditch and the street?
Yes, it cannot be smaller thatn 12" in diameter and has to be double wall If it is plastic and it has to be inspected by the zoning department.